THE CONSTRUCTION OF SVATOJI JOHN 2 COMPLEX ON THE 1ST LINE OF SEA IN SOZOPOL CONTINUES 1

THE CONSTRUCTION OF SVATOJI JOHN 2 COMPLEX ON THE 1ST LINE OF SEA IN SOZOPOL CONTINUES

08.04.2019